Pass4sure 70-246 Questions are updated and all 70-246 answers are verified by experts. Once you have completely prepared with our 70-246 exam prep kits you will be ready for the real 70-246 exam without a problem. We have Improve Microsoft 70-246 dumps study guide. PASSED 70-246 First attempt! Here What I Did.
Q1. -(Topic 7)
You have a System Center 2012 R2 infrastructure.
You plan to implement the Audit Collection Service (ACS). ACS reports will not be available
from the Operations Manager console.
You need to recommend a solution to view the ACS reports.
What should you include in the recommendation?
A. A Microsoft SQL Server Reporting Services (SSRS) instance
B. A reporting services point in Configuration Manager
C. A Reporting data warehouse for Service Manager
D. A Microsoft SharePoint Server report library
Answer: A
Q2. DRAG DROP -(Topic 1)
Topic 1, A.Datum
Overview
A. Datum Corporation is an accounting company that has 3,000 employees.
A. Datum has two main offices and five branch offices. The main offices are located in London and New York. The branch offices are located in Asia. All offices connect to each other by using a WAN link. Each office connects directly to the Internet.
Existing Environment
Active Directory Environment
The network contains an Active Directory forest named adatum.com. The forest contains a single domain. All domain controllers run Windows Server 2012.
Each office contains five domain controllers. Each office is configured as an Active Directory site.
System Center 2012 Infrastructure
A. Datum has a System Center 2012 infrastructure that contains six servers. The servers are configured as shown in the following table.
System Center 2012 is used to maintain a private cloud named Cloud1. Cloud1 consists of 10 Hyper-V hosts in the London office. Cloud1 hosts the following applications:
. A custom accounting application named App1. App1 consists of four virtual machines. Two of the virtual machines have Microsoft SQL Server 2012 installed. The other two virtual machines have the Web Server (IIS) server role installed. App1 is deployed by using a service template.
. A custom marketing application named App2. App2 consists of two virtual machines. One virtual machine has SQL Server 2012 installed. The other virtual machine has the Web Server (IIS) server role installed. App2 is deployed by using virtual machine templates.
. System Center 2012 Configuration Manager
. Microsoft SharePoint Server 2010
. Microsoft Exchange Server 2010
. Microsoft Lync Server 2010
Problem Statements
The virtual machine template used to deploy web servers for App2 does not include the Network Load Balancing (NLB) feature. A. Datum plans to scale out App2 to use NLB.
Requirements
Business Goals
A. Datum plans to make App1 available to its customers by hosting the application in either
A. Datum's data center or in a Windows Azure public cloud named Cloud2.
A. Datum wants to minimize hardware and software purchasing costs, whenever possible.
Planned Changes
A. Datum plans to implement the following changes:
Implement Operations Manager.
To App1, add a server that has Microsoft BizTalk Server deployed.
Deploy a new instance of App1 to the New York office. The instance must comply
with the Sarbanes-Oxley Act.
Implement Configuration Manager and integrate Configuration Manager and VMM.
Configuration Manager will be used to manage updates for the Hyper-V hosts.
Technical Requirements
A. Datum identifies the following technical requirements:
. Create a runbook that will be used by Service Manager to create an instance of a virtual machine. The virtual machine will be based on a virtual machine template named VMT1. Users must be able to request the creation of instances of the virtual machine from a self-service portal.
. Ensure that the users in the sales department can use a self-service portal to request that a new instance of App1 be created in Cloud1 for a customer. The new instance must only be created if the sales department manager approves the request.
. Ensure that if an Exchange Server 2010 service unexpectedly stops, a series of automatic actions is performed to remediate the service failure. The status of each performed action must be logged in an incident.
. Monitor App1 to ensure that client computers in the New York office can connect to an instance of App1 hosted in the London office. The monitoring solution must perform tasks that emulate a user accessing App1.
. Ensure that database administrators can access alerts, state information, and performance counters for all of the SQL Server servers in Cloud1 from a SharePoint webpage.
. Ensure that the instances of the App2 hosted in Cloud1 are monitored from a graphical diagram that displays all of the components of App2.
. Automatically create and assign incidents in Service Manager when an alert is generated in Operations Manager.
. Ensure that users can receive alert notifications from Operations Manager as Microsoft Lync instant messaging (IM) messages.
. Monitor the availability of the SharePoint Server 2010 server farm from the New York office.
. Ensure that administrators can undo changes made to the custom rules created in Operations Manager.
. Ensure that help desk users can contact the affected users of an incident by using IM.
. Add the new BizTalk Server server to App1 by using a service template.
You create a virtual machine template for the BizTalk Server server.
You need to recommend a method to update App1. The method must meet the technical requirements.
Which four actions should you perform in sequence? (To answer, move the appropriate four actions from the list of actions to the answer area and arrange them in the correct order.)
Answer:
Q3. -(Topic 1)
You need to recommend a solution to ensure that the sales department managers can create instances of App1 in Cloud1.
What should you include in the recommendation?
A. A subscription in App Controller and a task in Service Manager
B. A dashboard in Operations Manager and a distributed application
C. A task in Operations Manager and a distributed application
D. A service offering in Service Manager and a runbook in Orchestrator
Answer: D
Q4. HOTSPOT -(Topic 5)
You need to create a Service Level Tracking object to meet the requirements for monitoring the SLA for App1.
How should you configure the Service Level Tracking object? (To answer, select the appropriate options in the answer area.)
Answer:
Q5. -(Topic 7)
Your company has a private cloud that contains a System Center 2012 Service Manager infrastructure.
You need to create a service level objective (SLO) for incidents that have a priority value of 1.
What should you create first?
A. A service offering
B. A service template
C. A subscription
D. A queue
Answer: D
Q6. -(Topic 4)
You need to view the incidents and the related configuration items for the SQL Server clusters.
What should you use?
A. The all incident queue view
B. The active problem view
C. The service status list
D. A service map
Answer: D
Q7. -(Topic 7)
Your company deploys System Center 2012 R2 Operations Manager.
A network administrator deploys the Operations Manager agent to all of the internal servers that run Windows Server, and then configures notifications to be sent by email to several departmental groups.
Two days later, a network administrator opens the Operations Manager console and discovers hundreds of alerts.
The administrator closes all of the alerts in the console.
You need to change the resolution state of the alerts that were closed.
What should you do first?
A. From the Reporting workspace, select Microsoft Generic Report Library, and then select Alerts.
B. From the Authoring workspace, select Rules, and then set the scope to View all targets.
C. From the My Workspace workspace, create a new alert view.
D. From the Administration workspace, create a notification subscription.
Answer: C
Q8. DRAG DROP -(Topic 2)
You need to prepare the infrastructure to meet the software update requirement.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Q9. -(Topic 4)
You are preparing a virtual machine that will be used as a template.
You need to install SQL Server 2008 R2 on the virtual machine. The solution must meet
the technical requirement for creating virtual machines.
Which SQL Server 2008 R2 installation option should you select?
A. Install based on configuration file
B. Image completion of a prepared stand-alone instance of SQL Server
C. Image preparation of a stand-alone instance of SQL Server
D. Advanced cluster preparation
Answer: C
Q10. CORRECT TEXT -(Topic 5)
You need to prepare the environment to support the planned changes for App1.
In which order should you perform the actions? (To answer, move all of the actions from
the list of actions to the answer area and arrange them in the correct order.)
DRAG DROP
You need to prepare the environment to support the planned changes for App1.
In which order should you perform the actions? (To answer, move all of the actions from the list of actions to the answer area and arrange them in the correct order.)
Answer: <map><m x1="1" x2="264" y1="42" y2="85" ss="0" a="0" /><m x1="4" x2="261"
y1="96" y2="152" ss="0" a="0" /><m x1="4" x2="265" y1="164" y2="223" ss="0" a="0"
/><m x1="4" x2="261" y1="231" y2="272" ss="0" a="0" /><m x1="1" x2="258" y1="283"
y2="321" ss="0" a="0" /><m x1="272" x2="581" y1="39" y2="89" ss="1" a="0" /><m
x1="275" x2="582" y1="96" y2="156" ss="1" a="0" /><m x1="275" x2="579" y1="163"
y2="222" ss="1" a="0" /><m x1="275" x2="580" y1="224" y2="283" ss="1" a="0" /><m
x1="272" x2="580" y1="289" y2="326" ss="1" a="0" /><c start="3" stop="0" /><c start="1"
stop="1" /><c start="4" stop="2" /><c start="0" stop="3" /><c start="2" stop="4" /></map>
Box 1: Create an IP address pool.
Box 2: Install the provider for the hardware load balancer
Box 3: Add a hardware load balancer
Box 4: Create a Virtual IP (VIP) template
Box 5: Copy and modify the App1 service template.
Note:
*(box 1) When you create a static IP address pool for a VM network, VMM can assign static
IP addresses to Windows-based virtual machines (running on any supported hypervisor
platform) that use the VM network. By using static IP address pools, IP address
management for the virtual environment is brought within the scope of the VMM administrator.
* (Box 2, Box 3) Prerequisite for adding a Hardware Load balancer include:
You must obtain the load balancer provider from the load balancer vendor, and install the
provider on the VMM management server.
* Setting the load balancer affinity enables you to provide some control over which load
balancer will be used for a service. This is based on logical network information. VMM uses
this information to determine the valid static IP address pools that are accessible from both
the load balancer and the host group that the service tier will be deployed to.
* By adding load balancers to VMM management and by creating associated virtual IP
templates (VIP templates), users who create services can automatically provision load
balancers when they create and deploy a service.
*(box 4) A VIP template contains load-balancer-related configuration settings for a specific
type of network traffic. For example, you can create a template that specifies the load-
balancing behavior for HTTPS traffic on a specific load balancer by manufacturer and
model.
* (box 5) A load balancer must be configured before you deploy a service. After a service is