We provide real 70-499 exam questions and answers braindumps in two formats. Download PDF & Practice Tests. Pass Microsoft 70-499 Exam quickly & easily. The 70-499 PDF type is available for reading and printing. You can print more and practice many times. With the help of our Microsoft 70-499 dumps pdf and vce product and material, you can easily pass the 70-499 exam.
Q71. - (Topic 2)
You are using Microsoft Test Manager (MTM). You are using the Microsoft Solution Framework (MSF) for Agile Software Development process template. SharePoint integration and reporting are enabled.
You want to assess the progress of your team’s testing effort.
To do this, you need to:
Identify gaps in test coverage.
Monitor test progress for each requirement, and.
Identify how many test cases are passing or failing for each requirement.
What should you do?
A. Open the test plan in MTM and look at the test plan status.
B. From Team Explorer, open the Stories Progress report.
C. From the team portal, open the Test Plan Progress Excel Report.
D. From the team portal, open the User Story Test Status Excel Report.
Answer: D
...
Q72. DRAG DROP - (Topic 3)
You are on the development team of your company's newly-formed Scrum team.
At the start of your first sprint, your Scrum Master tells you that you are required to participate in the Daily Scrum or Stand-up.
You need to attend this meeting and give feedback to three important questions.
Which three questions should you answer in sequence? To answer, move the appropriate questions from the list in the answer area and arrange them in the correct order.
Answer:
Q73. - (Topic 2)
You are a test developer using Microsoft Test Manager (MTM).
You have a test case with a parameter variable that has several data values that are no
longer needed because of a change to the specifications.
You need to remove these unneeded values.
What should you do?
A. Delete the unneeded iterations.
B. Delete the unneeded test steps.
C. Delete the unneeded parameter values.
D. Delete the old parameters.
Answer: A
Q74. - (Topic 2)
You are using Microsoft Test Manager (MTM). You are using the Microsoft Visual Studio Scrum 1.0 process template.
Your client has added new capabilities to a product in development, which necessitates a major change to existing test cases. The produc owner has created a new product backlog item (PBI) and has provided you a link to a document that explains these new requirements.
You need to provide easy access to the requirements document from the test cases.
Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.)
A. From the Test Suite window, add the requirement document by using Add Requirements.
B. From the Links tab, link the requirements document to the PBI.
C. From the Test Plan Manager, add a link to the PBI.
D. For each test case, use the Tested Backlog Items tab to add a link to the PBI.
Answer: B,D
Q75. - (Topic 3)
You are planning to develop a new application.
You need to ensure that the code is easy to test and obtain high code coverage.
What should you do?
A. Create as many static methods as possible.
B. Create a fake for each class that you are testing.
C. Ensure that concrete classes depend only on other concrete classes.
D. Ensure that each class has only one responsibility.
Answer: D
Q76. DRAG DROP - (Topic 2)
Your testing team has a Microsoft Visual Studio Team Foundation Server (TFS) 2013 with a Microsoft Test Manager (MTM) environment. No new configurations have been added yet to this environment. Your organization is upgrading all computers from Windows 7 to Windows 8.1,
The organization has decided to standardize on Internet Explorer (IE) 11 for all internal computers. As a result, the testing team needs to test everything on IE 11. Since this conversion will take a year to implement, the testing team needs to leave current configurations in place.
You need to set up an IE 11 configuration to use in your current test cases.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Q77. - (Topic 3)
Historically your IT group has done a poor job of reporting issues and successes to key decision makers in a timely manner, due to incomplete or inconsistent application lifecycle management (ALM) practices.
You are implementing Scrum as the process framework for new projects. The scrum master will publish daily progress reports to the product owner and key stakeholders.
You need to view daily progress and identify if bottlenecks are occurring in the development process.
Which report should you use?
A. Bug Trends
B. Sprint Burndown
C. Cumulative Flow
D. Release Burndown
Answer: C
Explanation: Kanban teams prefer to use a Cumulative Flow Diagram to visualize work across the entire backlog. Visualizing the backlog in this manner can help to identify bottlenecks in the process. Scrum Teams can also use a Cumulative Flow Diagram.
Professional Scrum Development with Microsoft Visual Studio 2012 p.6
Q78. - (Topic 2)
You are a test developer using Microsoft Test Manager (MTM).
You are developing a test case that must be run multiple times with different input values for a specific field each time. You have a list of values that will be used for the input.
You need to modify the test to enter each value into the field.
What should you do?
A. Insert a parameter into the Action column of the test step and enter the input values into the Parameter Values pane.
B. Insert a parameter into the Expected Results column of the test step and enter the input values into Parameter values pane.
C. Insert a parameter into the Action column of the test step.
D. Create test steps for each input value in the Action column.
Answer: A
Q79. - (Topic 2)
You are using Microsoft Test Manager (MTM) to run manual tests.
Testers reported a bug during a test run on the V1.0 build. A build for V2.0 has been
created. Testers are still running tests against the V1.0 build.
You need to verify that the bug has been fixed in build V2.0.
What should you do?
A. Change the default build for the test plan to V2.0 and run the test case.
B. Run the test case with default settings; the latest build will be selected automatically.
C. Change the build to V2.0 by using Run with options and run the test case.
D. Change the build property for the test case to the V2.0 build and run the test case.
Answer: C
Q80. - (Topic 2)
You are using Microsoft Test Manager (MTM) to perform exploratory testing.
You need to ensure that any bugs or test cases created during an exploratory test session
are associated with a specific requirement for the purposes of traceability.
What should you do?
A. From the Test activity, select View Exploratory Test Sessions. Open a session and click the Copy Link button.
B. From the Run Tests activity, select a test case that is a part of a requirement suite and select Run.
C. Create a requirement suite in the test plan, right-click on the suite, and select Explore Requirement.
D. From the Do Exploratory Testing activity, select Explore.
Answer: C