It is more faster and easier to pass the Microsoft 70-499 exam by using Verified Microsoft Recertification for MCSD: Application Lifecycle Management questuins and answers. Immediate access to the Improved 70-499 Exam and find the same core area 70-499 questions with professionally verified answers, then PASS your exam with a high score now.
Q141. - (Topic 1)
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server and a virtual test environment that uses Lab Management 2012 along with System Center Virtual Machine Manager (SCVMM) 2010.
You want to install a test virtual machine that is hosted within a lab environment.
You need to ensure that the test virtual machine can support all the features of Lab Management 2012.
Which component should you install on the test virtual machine?
A. Agents for Visual Studio 2012
B. Visual Studio Build Agent 2012
C. Visual Studio Test Agent 2012
D. Visual Studio Lab Agent 2012
Answer: A
Q142. - (Topic 2)
You are a test developer using Microsoft Test Manager (MTM).
You have copied a test case that has five parameters.
You need to change the parameter names in the new test case and keep the parameter
values intact.
What should you do?
A. For each parameter, click Rename parameter in the Parameter Values pane.
B. Replace the existing parameters with new, renamed parameters.
C. Edit each test step and rename the parameters.
D. Copy and paste the data values from the old parameters into new parameters.
Answer: D
Q143. - (Topic 1)
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server.
A user accidentally deletes a file from version control.
You need to restore the deleted file to version control.
What should you do?
A.
.
Add a file with the same name in the same place in source control as the old file.
.
Right-click the file in the source control explorer and select Rollback.
.
Roll back the file to a change set right before the file was deleted.
B.
.
In Visual Studio 2012 click Tools, then click Options.
.
Expand the Source Control option, select Visual Studio Team Foundation, and then select Show deleted items in the Source Control Explorer.
.
Right-click the file in Source Control Explorer and select Rollback.
.
Roll back the file to a changeset right before the file was deleted.
C.
.
In Visual Studio 2012 click Tools, then click Options.
.
Expand the Source Control option and select Visual Studio Team Foundation, then select Show deleted items in the Source Control Explorer.
.
Right-click the file in Source Control Explorer and select Advanced, then select Get Specific Version.
.
Select a version of the file created right before the file was deleted.
D.
.
In Visual Studio 2012 click Tools, then click Options.
.
Expand the Source Control option and select Visual Studio Team Foundation, then select Show deleted items in the Source Control Explorer.
.
Right-click the file in Source Control Explorer and select Undelete.
Answer: D
80. - (Topic 1)
Your network environment includes a single Microsoft Visual Studio Team Foundation Server (TFS) 2012 server.
You are using the Default Template to build a solution that will be debugged by using IntelliTrace.
You need to ensure that symbols will be available to IntelliTrace for each build.
Which three actions should you perform? (Each correct answer presents part of the solution. Choose three.)
A. Update the build definition to set IndexSources to True.
B. Set up a UNC path to the symbol location (for example, \\sharename\symbols) and grant Full Control permissions to the user account under which the build agent is running.
C. Configure the build trigger for Continuous Integration.
D. Add the UNC path to the build’s list of working folders.
E. Update the build definition by configuring the UNC path to Publish Symbols.
Answer: A,B,C
Q144. - (Topic 1)
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. Developers use Visual Studio 2012 to maintain a library of commercial .NET components provided for sale by your company.
You release new versions quarterly and provide support for the four most recent versions. When issues are logged with previous versions it is time-consuming for your developers to locate and associate the correct version of debugging symbols and source code.
You need to streamline the process for debugging prior versions of your library.
What should you do?
A. When it is time to deploy each quarterly update, copy the release binaries into version control.
B. Within the build definition, set the Index Sources property to True and provide a path for the symbols. Add this path to the list of symbol file locations in Visual Studio when debugging that particular version.
C. When it is time to deploy each quarterly update, label the source code with the version number being released.
D. Enable IntelliTrace within Visual Studio. Within the build definition, set the IntelliTrace option to True.
Answer: B
Q145. - (Topic 3)
Your client is utilizing the Microsoft Visual Studio Scrum 2.0 process template.
Your client provides a set of acceptance tests for Product Backlog Items (PBI). The PBI work has been committed to in the upcoming sprint.
You need to ensure that the status of the acceptance tests can be reported from TFS.
What should you do?
A. Store the acceptance test as rows in a Microsoft Excel spreadsheet and attach the spreadsheet to the PBI work item.
B. Store the acceptance test as rows in a Microsoft Excel spreadsheet. Save the spreadsheet in the associated project portal site and link it to the PBI work items.
C. Create Test case work items. Link the test cases to the PBI work items by using a Tests link type.
D. Create Test case work items. Link the PBJ work items by using a Parent link type to the test cases.
Answer: C
Q146. DRAG DROP - (Topic 3)
You are developing a new application that contains complicated validation and transformation logic on data pulled from three separate source systems.
You need to get feedback from your stakeholders to verify that your application meets their requirements before any other development tasks have been started. You also need to ensure that this application sub-system is correct before any other dependent module can be developed.
What should you do? (To answer, move the five appropriate actions from the list of actions to the answer area and arrange them in the correct order.)
Answer:
Q147. - (Topic 3)
Historically your IT group has done a poor job of reporting issues and successes to key decision makers in a timely manner, due to incomplete or inconsistent application lifecycle management (ALM) practices.
You are implementing Scrum as the process framework for new projects. The scrum master will publish daily progress reports to the product owner and key stakeholders.
You need to view daily progress and identify if bottlenecks are occurring in the development process.
Which report should you use?
A. Bug Trends
B. Sprint Burndown
C. Cumulative Flow
D. Release Burndown
Answer: C
Explanation: Kanban teams prefer to use a Cumulative Flow Diagram to visualize work across the entire backlog. Visualizing the backlog in this manner can help to identify bottlenecks in the process. Scrum Teams can also use a Cumulative Flow Diagram.
Professional Scrum Development with Microsoft Visual Studio 2012 p.6
Q148. - (Topic 1)
...
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. Your development team uses Visual Studio 2012.
You store specialized design files within your Visual Studio solution by using version control. These design files are stored in a proprietary binary format and use the filename extension .dzn.
You need to meet the following requirements:
Ensure that all developers can modify these design files.
Prevent multiple check-outs on all .dzn files.
Ensure that all other file types can be edited by multiple developers at the same
time.
What should you do?
A. Within the Source Control Explorer, right-click each .dzn file and uncheck the Allow multiple check outs option.
B. Add a new file type for .dzn to the Team Project Source Control Settings and clear the Enable file merging and multiple check out checkbox.
C. Within the Visual Studio Options dialog box for Source Control, add the .dzn extension to the Prevent multiple check-outs for the following file types list in the Visual Studio Team Foundation server node.
D. Add a new file type for .dzn to the Team Project Collection Source Control Settings and clear the Enable file merging and multiple check out checkbox.
Answer: D
Q149. - (Topic 3)
You are developing a new application. The application will require rapid changes after it is in production.
You need to implement practices that promote high quality and ensure the code is maintainable.
Which three practices should you implement? (Each correct answer presents part of the solution. Choose three.)
A. Refactor code based on code metrics from the maintainability index.
B. Keep the code tightly coupled.
C. Create as few classes as possible.
D. Create unit tests and monitor code coverage.
E. Create as few assemblies as possible.
F. Refactor code based on code clone analysis.
Answer: A,D,F
Q150. DRAG DROP - (Topic 2)
Your team uses the Microsoft Visual Studio Scrum process template for a project. Your team uses the Area to filter by Function, with subcategories pertinent to those functions.
Your stakeholders want to be able to view requirements and quality reports by specific department.
You need to modify the Test Case Readiness report to add a filter so that the report can be filtered appropriately.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer: