It is impossible to pass Microsoft 70-499 exam without any help in the short term. Come to Ucertify soon and find the most advanced, correct and guaranteed Microsoft 70-499 practice questions. You will get a surprising result by our Avant-garde Recertification for MCSD: Application Lifecycle Management practice guides.
Q71. - (Topic 2)
Your company assigns you to a Scrum team. You are planning the release and sprint.
You have created global lists, which are pick lists that you can include in one or more fields and types of work items.
The product owner reviews the Product Backlog with the team and assigns each work item to a release and a sprint. One of the fields in the work item is using the global list as the pick list.
You need to assign the minimum permissions to export the work item type definition, including the global lists.
Which two permissions should you use? Each correct answer presents a complete solution.
A. View collection-level information permission set to Allow
B. Member of the Project Collection Valid Users
C. View system synchronization information permission set to Allow
D. Member of the Project Administrators
Answer: A,C
Explanation: http://msdn.microsoft.com/en-us/library/ms252587.aspx
Q72. - (Topic 1)
You have an existing deployment of Microsoft Visual Studio Team Foundation Server (TFS). The application tier and data tier are on separate dedicated servers.
You need to provide redundancy to the application tier and increase performance.
Which two actions should you perform? Each correct answer presents part of the solution.
A. Set up a SQL Server failover cluster.
B. Set up Network Load Balancing.
C. Install an additional application-tier server.
D. Ensure that the application tier and configuration database are on the same server.
Answer: B,C
Explanation: http://msdn.microsoft.com/en-us/library/ee259689.aspx
Q73. - (Topic 3)
You manage a development team for a group of stakeholders that are physically remote from your development center. Stakeholders have blocked out dates and times on their
...
schedules for your team.
The stakeholders are concerned that several of the project requirements will not meet their needs due to changing market conditions.
You need to ensure that the following requirements are met: s
Your team is doing effective and efficient work.
The work is meeting the needs of the business.
The project’s timeline is not at risk.
Which two actions should you perform? (Each correct answer presents part of the solution. Choose two.)
A. Institute a policy of sign-offs for each requirement and design document.
B. Develop a series of iterative proofs of concept that reflect a partial delivery of requirements and get feedback from the product owner.
C. Instruct the team to create a comprehensive set of design documents for each layer of the system. Schedule a review with the stakeholders to get their feedback.
D. Add a primary stakeholder to your team as the product owner.
Answer: B,D
Q74. - (Topic 2)
You are using Microsoft Test Manager (MTM). You are using the Microsoft Solution
Framework (MSF) for Agile Software Development process template.
You plan to validate that all the user stories for the current iteration will be covered by your
testing efforts.
You need to create test suites that will allow you to validate user story test coverage.
Which type of test suites should you create?
A. Query-based
B. Feature-based
C. Requirements-based
D. Static
Answer: C
Q75. - (Topic 2)
You run a manual test on an application by using Microsoft Test Manager (MTM). You have the following testing requirements:
. Collect the diagnostic data from the local machine, and
. Collect the diagnostic data from a remote SQL Server.
You need to identify the components required to configure the test environment to comply with these requirements.
Which two components should you choose? (Each correct answer presents part of the solution. Choose two.)
A. Configuration variables
B. Data collectors
C. Local and remote roles
D. Build controller
Answer: B,C
Q76. - (Topic 2)
You are a test developer using Microsoft Test Manager (MTM).
A test case that you maintain needs to be modified to test for a series of values returned
after a price calculation. You add a test step to test for these data values.
You need to add a parameter to the test case that represents the expected results.
What are two possible ways to achieve this goal? (Each correct answer presents a
complete solution. Choose two.)
A. Click in the test step Action column, then click Insert parameter and type the parameter name.
B. Enter the parameter name into the Parameter Values field and press Enter.
C. Click in the test step Expected Result column and type the parameter name preceded by the @ symbol.
D. Click in the test step Expected Result column, then click Insert parameter and type the parameter name.
E. Click in the test step Expected Result column and type the parameter name.
Answer: C,D
Q77. - (Topic 2)
You are using Microsoft Test Manager (MTM). You are supporting a set of different
configurations for your product.
You plan to prepare the test plan by assigning the tester for each test case.
You need to configure the test plan to support this requirement.
What should you do?
A. Assign the tester to each combination of test case and configuration.
B. In the Assigned to field for each test case and configuration, select Tester.
C. Assign the tester as the configuration owner for each configuration.
D. Assign the tester to each combination of test suite and configuration.
Answer: A
Q78. - (Topic 2)
You are managing test cases by using Microsoft Test Manager (MTM).
You plan to test a part of your product on a specific configuration you create.
You need to ensure that new test cases in a specific test suite default to use this
configuration without impacting other test suites.
What should you do?
A. Create a new test plan for testing with the specific configuration.
B. Select all test cases in the test suite and select the specific configuration.
C. Select the specific configuration as the default configuration for the test plan.
D. Select the specific configuration as the default configuration for the test suite.
Answer: D
Q79. - (Topic 1)
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. Developers use Visual Studio 2012.
You recently copied your existing TFS environment onto a new set of servers on the same network.
You need to ensure that developers can continue connecting to the original TFS server.
What should you do?
A. Rename the new Team Project Collection to a unique name.
B. Run the ChangeServerID command on the new TFS environment.
C. Configure the Team Project Collections with the same name on the same network.
D. Run the ChangeServerID command on the original TFS environment.
Answer: B
Q80. - (Topic 1)
Your development environment includes a team project on TFSPreview. The Team Build definitions include the standard options for staging build output when using the default template.
You need to ensure that the build output is available to anyone with access to the team project. What should you do?
A. Configure a valid UNC path (in the form \\server\share).
B. Configure the source control folder named $/<Team project name>/Drops.
C. Configure the folder for any valid source control folder.
D. Configure the build output for any SharePoint document library.
Answer: B