Cause all that matters here is passing the Microsoft 70-695 exam. Cause all that you need is a high score of 70-695 Deploying Windows Devices and Enterprise Apps exam. The only one thing you need to do is downloading Examcollection 70-695 exam study guides now. We will not let you down with our money-back guarantee.
Q31. DRAG DROP - (Topic 3)
You need to prepare Server1 and Server101 for an operating system deployment.
What should you configure on each server? To answer, drag the appropriate actions to the correct servers. Each action may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
Answer:
Topic 4, Proseware Inc.
Case Study Overview
General Overview
Proseware Inc., is a manufacturing company that has 3,000 employees. The company has a sales department a marketing department, a research department, a customer service department, and a human resources department.
Physical Locations
Proseware has two main offices and five branch offices. The main offices are located in New York City and Paris. The branch offices are located throughout North America.
All offices have a high-speed connection to the Internet. The offices connect to each other through the Internet by using VPN appliances.
Existing Environment Active Directory
The network contains two Active Directory forests named na.proseware.com and fr.proseware.com. Each forest contains a single domain. All domain controllers run Windows Server 2012 R2.
The main office in New York City and all the branch offices each contain a domain controller for the na.proseware.com forest. The main office in Paris contains domain controllers for the fr.proseware.com forest only.
Due to legal requirements, the na.proseware.com and fr.proseware.com forests must remain separate. Administrators from each forest are allowed to manage the resources in their respective forest only.
Users from all of the departments are located in each office. Users in the research department store their research data in local folders on their computer. The data can be up to 100 GB on each computer.
Each office is configured as an Active Directory site. All of the domain controllers are configured as DNS servers. All of the client computers are configured to connect to the DNS servers in their respective office only. All of the domain controllers are configured as DHCP servers.
New York Office
The computers in the New York City office are managed by using Microsoft System Center 2012 R2 Configuration Manager. The New York City office has the following servers and client computers:
• A Key Management Service (KMS) server host
• Client computers that run Windows 7 and Microsoft Office 2010
• • Five file servers that host multiple shared folders and run Windows Server 2012 R2
• A server that runs Windows Server 2012 R2 and is configured as a Configuration Manager site server
Branch Offices
Each branch office has the following servers and client computers:
• Client computers that run Windows 7 and Office 2010
• A file server that hosts multiple shared folders and runs Windows Server 2012 R2
Currently, the branch offices are not managed by using the Configuration Manager deployment in the New York City office.
Paris Offices
The Pans office has the following servers and client computers:
• Client computers that run Windows 7 and Office 2010
• Five file servers that host multiple shared folders and run Windows Server 2012 R2 Currently, the activation of the client computers in the Pans office is performed manually. Deployments
Currently, all new client computers are shipped initially to and imaged in the New York City office, and then shipped to the other offices. There are multiple images for both 32-bit and 64-bitcomputers. The images contain specific drivers for each type of computer. All of the computers are PXE-compatible.
If a client computer must be reimaged, the reimaging is performed locally at each office by using a boot disk and a USB hard drive that contains multiple images. USB hard drives storing updated images are sent to each office every six months.
Applications
A third-party desktop application named App1 is used by the sales department.
All of the users in the human resources department use an application named HR1. HR1 is installed by using a Windows Installer (MSI) package. HR1 is compatible with Windows 7 only.
Problem Statements
Proseware identifies the following issues:
• Users in the branch offices report that it can take up to four weeks to receive a requested new client computer, which is too long.
• If a client computer must be reimaged, it can take several hours before the computer is ready for use again due to the updates that must be applied.
• Currently, the hardware used for the client computers in the Paris office is undocumented. All of the computers in the customer service department and the research department were replaced during the past year.
Requirements Business Goals
As much as possible, Proseware plans to minimize the costs associated with purchasing hardware and software.
Planned Changes
Proseware plans to deploy a new version of its standard operating environment (SOE). The new SOE will contain the following:
• A volume license edition of Windows 8.1 Enterprise (64-bit)
• A volume license edition of Office 2013 (32-bit)
A new line-of-business Windows Store app named App2 will be deployed. App2 will be used by all users.
New client computers will be delivered directly from the hardware vendor to each office. As a result, Proseware plans to change the imaging process.
Technical Requirements
Proseware identifies the following technical requirements:
• Minimize the size of desktop images.
• Centralize the activation of all the client computers.
• Minimize the amount of network traffic over the VPN.
• Minimize the number of desktop images that must be maintained.
• Ensure that only the users in the human resources department can access HR1.
• Ensure that the data of the research department users is retained while deploying the new image.
• Minimize the amount of time it takes to upgrade the research department computers in the Paris office.
• Ensure that a branch office administrator can deploy a new image to new client computers with minimal delay.
• Ensure that the French language is configured as the default language for the client computers in the Paris office.
• • A network technician will visit each client computer in the Paris office to start the operating system deployments.
• Gather a detailed hardware inventory of all the client computers in the Paris office without installing any additional software on the computers.
• Users in the research and customer service departments in the Paris office will have the new image deployed to their current computer. The current Windows installation will not be preserved during the upgrade.
• All of the other client computers in the Paris office will be replaced with new computers during the next two years. During this time, some computers may need to be reimaged by using the current Windows image.
Q32. HOTSPOT - (Topic 1)
You need to identify the storage location and the file name of the automation scripts for the kiosk computers.
What should you identify? To answer, select the appropriate storage location and file name in the answer area.
Answer:
Q33. HOTSPOT - (Topic 3)
You need to identify which actions must be performed to distribute the boot images from Server1 to Server101, once Server101 is configured as a distribution point.
What should you identify? To answer, select the appropriate server to perform each action in the answer area.
Answer:
Q34. - (Topic 5)
Your company has a main office and 10 branch offices.
You have a deployment of Microsoft System Center 2012 R2 Configuration Manager at the main office that is used to deploy applications to internal users. The applications include Microsoft Office 365 ProPlus.
Users in the sales department have laptops that run a corporate image of Windows 8.1 Enterprise. The Configuration Manager client is installed on each user's computer. The sales department users typically work remotely from customer sites, which are located in different cities around the world.
You need to recommend a solution to deploy the applications to the sales department users.
What is the best recommendation to achieve the goal? More than one answer choice may achieve the goal. Select the BEST answer.
A. a VPN profile
B. a boundary group
C. a cloud distribution point
D. a remote connection profile
Answer: C
Explanation: References: https://technet.microsoft.com/en-gb/library/gg712321.aspx
Q35. - (Topic 5)
You plan to deploy a Windows 8.1 Enterprise image that contains a volume license version of Microsoft Office 2013. The image will be captured from a reference computer. Office is activated by using the Key Management Service (KMS).
On the reference computer, you install Office 2013 and you verify that all of the Office applications start properly.
You need to ensure that when the image is deployed, users are not prompted for activation when they first start an Office application.
What is the best action to perform before you capture the image? More than one answer choice may achieve the goal. Select the BEST answer.
A. Rearm Office 2013 on the reference computer.
B. Run setup.exe and specify the /modify switch.
C. Modify the Config.xml file.
D. Reinstall Office 2013 on the reference computer.
Answer: A
Explanation: References: https://technet.microsoft.com/en-gb/library/dn385362.aspx
Q36. - (Topic 5)
You maintain a base operating system image for your company. The image does not contain hardware-specific drivers. The image is distributed to the desktop support team, which is responsible for maintaining a driver repository on a file share named Share1.
You have a client computer named Client1 that runs Windows 8.1 Enterprise. Client1 will be used as the reference computer for the next version of the base image.
You plan to generalize Client1, capture an image of Client1, and then distribute the image to the desktop support team.
You need to configure a Sysprep answer file to ensure that the next time the image starts, device drivers from Share1 are added to the local driver repository. The solution must ensure that the drivers are added without entering the Out-of-Box-Experience (OOBE) phase.
Which configuration pass in the unattended file should you configure?
A. specialize
B. auditSystem
C. generalize
D. windowsPE
Answer: D
Explanation: References:
https://technet.microsoft.com/en-gb/library/cc749307(v=ws.10).aspx
Q37. DRAG DROP - (Topic 5)
You deploy the Microsoft Deployment Toolkit (MDT) to a server named Server1.
You plan to deploy Windows 8.1 Enterprise to client computers by using MDT. You also plan to deploy two applications named App1 and App2.
You need to ensure that all of the client computers install App1 as part of their deployment of Windows 8.1 Enterprise. The solution must provide users with the ability to choose to install App2.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Q38. HOTSPOT - (Topic 5)
Your company has a Microsoft Office 365 subscription.
From a network share, you plan to deploy Office 365 ProPlus to the client computers in a branch office by using the Office Deployment Tool. The share is located at \\Server1\Office.
Some of the users in the branch office are consultants who often work for extended periods in customer locations. All other users in the branch office work in the customer service
department.
During testing, you discover that Internet traffic spikes excessively during the installation of updates.
From the Office Deployment Tool, you create a configuration file named Config1.xml for the consultants and you create a configuration file named Config2.xml for the customer service department.
You need to ensure that the Office applications on all of the client computers are updated regularly. The solution must minimize the amount of Internet traffic, whenever possible.
Which configuration file should you modify and which configuration element should you add to the configuration file? To answer, select the appropriate options in the answer area.
Answer:
Q39. HOTSPOT - (Topic 5)
You have a server named Server1 that runs Windows Server 2012 R2. Server1 is a Windows Deployment Services (WDS) server.
You add an x86 capture image named Image1 and an x64 capture image named Image2 to WDS on Server1.
The network contains the client computers configured as shown in the following table.
You need to identify which capture image can be used on each computer.
What should you identify? To answer, select the appropriate images for each computer in the answer area.
Answer:
Q40. - (Topic 5)
Your network contains one Active Directory forest named contoso.com. The forest has a deployment of Microsoft System Center 2012 R2 Configuration Manager.
You plan to add a server named Server1 as a distribution point. Server1 will be used only by client computers on the internal network that run Windows 8.1 Enterprise. The Windows Deployment Services server role will NOT be installed on Server1.
You need to identify which firewall port on Server1 must be open to ensure that Configuration Manager clients can download application packages from Server1.
Which TCP port should you identify?
A. 53
B. 8080
C. 443
D. 636
Answer: C