Q31. - (Topic 2) 

Which event Kanban requires the Pegging event processing batch process to create Kanbans? 

A. stock replenishment event 

B. sales line event 

C. BOM line event 

D. Kanban line event 

Answer:

Reference: 

Microsoft Dynamics AX 2012, Lean Manufacturing: Kanban and Pull Based Manufacturing, White Paper, July 2011, p34-35. 


Q32. - (Topic 1) 

In which Microsoft Dynamics AX 2012 element do you specify the Work in Process (WIP) accounts for a production flow? 

A. Kanban quantity calculation policy 

B. Kanban rule 

C. production group 

D. default production flow 

Answer:

Reference: 

http://msdn.microsoft.com/en-us/subscriptions/aa548500.aspx 


Q33. - (Topic 1) 

In Microsoft Dynamics AX 2012, what is the relationship between the Value Stream and the production flow? 

A. The production flow may be represented by a single Value Stream. 

B. The Value Stream must consist of at least two production flows. 

C. The Value Stream may be represented by a single production flow. 

D. The production flow must consist of at least two Value Streams. 

Answer:

Reference: 

Microsoft Dynamics AX 2012, Lean Manufacturing: Production flows and activities, White Paper, April 2011, p 5. 


Q34. - (Topic 2) 

You are configuring a Lean production flow in Microsoft Dynamics AX 2012. Which cost group type should you assign to a subcontracting work cell? 

A. indirect 

B. direct outsourcing 

C. external operation 

D. direct materials 

Answer:

Reference: 

Microsoft Dynamics AX 2012, Lean Manufacturing: Production flows and activities, White Paper, April 2011, pp 41, 44. 


Q35. - (Topic 2) 

Which status allows the product quantity and Kanban quantity to be edited in a Kanban quantity proposal? 

A. Created 

B. Updated 

C. Completed 

D. Calculated 

Answer:

Reference: 

http://msdn.microsoft.com/en-us/subscriptions/hh597101.aspx 


Rebirth mb6-884 exam:

Q36. - (Topic 1) 

You add a Value Stream to an Organization hierarchy in the Organization administration module of Microsoft Dynamics AX 2012, and publish the Organization hierarchy. 

How is the Value Stream in the published Organization hierarchy distinguished from Value Streams not belonging to Organization hierarchies? 

A. A new record is created for the Value Stream added to the Organization hierarchy and it contains a reference to the Organization hierarchy. 

B. The In hierarchy check box in the Value Stream is selected. 

C. The DUNS number field in the Value Stream contains a reference to the Organization hierarchycode. 

D. After the Value Stream is added to a hierarchy, it can be edited only in the Hierarchy designer and not in the Value Stream form. 

Answer:

Reference: 

http://msdn.microsoft.com/en-us/subscriptions/hh208817.aspx 


Q37. - (Topic 1) 

You are posting a purchase receipt for a subcontracted service as part of a Lean production flow in Microsoft Dynamics AX 2012. To which ledger accounts does the transaction post? 

A. Liability and Raw Material Inventory 

B. Liability and Work In Process (WIP) 

C. Raw Material Inventory and Work In Process (WIP) 

D. Raw Material Inventory and Variance 

Answer:

Reference:http://dynamicscare.com/blog/index.php/activity-based-subcontracting/ 


Q38. - (Topic 1) 

When a manufacturing Kanban job is reported as complete, which of the following values may be specified? (Each correct answer presents a complete solution. Choose three.) 

A. good quantity 

B. first time through designation 

C. product dimensions 

D. error quantity 

E. output warehouse/location 

Answer: A,B,D 

Reference: 

http://msdn.microsoft.com/en-us/subscriptions/hh699643.aspx 


Q39. - (Topic 2) 

Which Lean manufacturing concept establishes a production context and a cost context for the Microsoft Dynamics AX 2012 Kanban scenarios? 

A. Capable to Promise (CTP) 

B. mixed mode manufacturing 

C. production flows 

D. semi-finished products 

Answer:

Reference: 

Microsoft Dynamics AX 2012, Lean Manufacturing: Production flows and activities, White Paper, April 2011, p 6. 


Q40. - (Topic 1) 

You need to ensure that a new Kanban of the same type will be created whenever the material handling unit associated with a Kanban is emptied. 

Which replenishment strategy should you use? 

A. Event 

B. Scheduled 

C. Fixed Quantity 

D. Stock Transfer 

Answer:

Reference: 

Microsoft Dynamics AX 2012, Lean Manufacturing: Kanban and Pull Based Manufacturing, White Paper, July 2011, p 7.