Apply Examcollection Microsoft MB6-884 test out inquiries to gain access to the Product Good quality. Youll not refrain from purchasing the MB6-884 Exam Problems mainly because it?¡¥s the ultimate on-line MB6-884 Examine Material. 1000s of successful online MB6-884 applicants have got passed the precise MB6-884 Exam with the MB6-884, and so are you going to!

2021 Jan mb6-884 download:

Q1. - (Topic 1) 

Which element defines the Work in Process (WIP) ledger accounts for a Lean manufacturing production flow? 

A. cost group 

B. costing version 

C. production group 

D. Value Stream 

Answer:

Reference: 

Microsoft Dynamics AX 2012, Lean Manufacturing: Production flows and activities, White Paper, April 2011, p 33. 


Q2. - (Topic 2) 

What is a valid exception to the standard cost requirement in Microsoft Dynamics AX 2012? 

A. a manufacturing Kanban with Update on hand on pick and Update on hand on receipt both set to Yes 

B. a manufacturing Kanban with Update on hand on pick and Update on hand on receipt both set to No. 

C. a withdrawal Kanban with Update on hand on pick and Update on hand on receipt both set to No. 

D. a withdrawal Kanban with Update on hand on pick and Update on hand on receipt both set to Yes. 

Answer:

Reference: 

Microsoft Dynamics AX 2012, Lean Manufacturing: Production flows and activities, White Paper, April 2011, p 28-30. 


Q3. - (Topic 1) 

You are creating event Kanban rules in Microsoft Dynamics AX 2012. 

You need to replenish material that is required for a downstream process activity. 

Which event type should you activate? 

A. Kanban line event 

B. stock replenishment event 

C. sales event 

D. BOM line event 

Answer:

Reference: 

Microsoft Dynamics AX 2012, Lean Manufacturing: Kanban and Pull Based Manufacturing, White Paper, July 2011, p 8. 


Q4. - (Topic 2) 

In Microsoft Dynamics AX 2012, you create a work cell that has a capacity model setting of Throughput. Which of the following values are used to calculate the capacity load of a Kanban job on the work cell? (Each correct answer presents a partial solution. Choose three.) 

A. start date 

B. cycle time 

C. Kanban quantity 

D. throughput ratio 

E. unit correction factor 

Answer: B,C,D 

Reference: Microsoft Dynamics AX 2012, Lean Manufacturing: Kanban and Pull Based Manufacturing, White Paper, July 2011, p 10. 


Q5. - (Topic 1) 

From where can you manually create an event Kanban for Kanban line events? (Each correct answer presents a complete solution. Choose two.) 

A. pegging tree 

B. sales order line 

C. Kanban board for process jobs form 

D. Kanban rules form 

Answer: C,D 

Reference: http://msdn.microsoft.com/en-us/subscriptions/hh781101.aspx http://msdn.microsoft.com/en-us/subscriptions/hh227370.aspx 

Topic 2, VolumeB 


Most recent mb6-884 microsoft dynamics ax 2012 lean manufacturing:

Q6. - (Topic 2) 

Which cost category of a work cell is considered in costing for Lean manufacturing in Microsoft Dynamics AX 2012? 

A. setup 

B. quantity 

C. direct outsourcing 

D. run time 

Answer:

Reference: 

http://technet.microsoft.com/en-us/library/hh208503.aspx 


Q7. - (Topic 1) 

At what level is the standard cost maintained for products that are included in a production flow? 

A. item model group level 

B. item group level 

C. item number level 

D. site level 

Answer:

Reference: 

Microsoft Dynamics AX 2012, Lean Manufacturing: Production flows and activities, White Paper, April 2011, p 34. 


Q8. - (Topic 1) 

Which of the following actions can be performed when processing with the supply schedule in Microsoft Dynamics AX 2012? (Each correct answer presents a complete solution. Choose three.) 

A. create a new scheduled Kanban 

B. create a new planned order 

C. run Master Scheduling 

D. delete planned orders 

E. link a Kanban rule to a production flow 

Answer: A,B,C 

Reference: 

http://dynamicscare.com/blog/index.php/using-the-supply-schedule-in-dynamics-ax-2012/ 


Q9. - (Topic 1) 

What is created from a purchase agreement to signal demand for a product or service provided by a subcontractor in Microsoft Dynamics AX 2012? 

A. manufacturing Kanban 

B. sales order 

C. event Kanban 

D. release order 

Answer:

Reference: 

Microsoft Dynamics AX 2012, Lean Manufacturing: Production flows and activities, White Paper, April 2011, p 44. 


Q10. - (Topic 2) 

Which statement is true when Include safety stock is selected in a Kanban quantity calculation policy? 

A. The safety factor is excluded. 

B. a Kanban simple formula is created. 

C. A service level is required. 

D. Demand during lead time is considered constant. 

Answer:

Reference: http://msdn.microsoft.com/en-us/subscriptions/hh527163.aspx