Highest Quality of 7004 exam fees materials and testing engine for Avaya certification for customers, Real Success Guaranteed with Updated 7004 pdf dumps vce Materials. 100% PASS Avaya Communication Server 1000 for Avaya Aura® Maintenance Exam exam Today!
Question No: 1
Click the Exhibit button.
A customer has a Communication Server 1000 RIs. 7 x system with System Manger / Unified Management (UCM) enabled. They have requested the addition of two new UCM Administrator User with the limited ability to provision telephones at each site. Refer to the exhibit for the roles current existing in the system.
Which action can the Network Administrator take to add these new accounts per the customeru2021s requirements?
A. Change the built-in MemberRegister role to add the permissions required to allow telephone configuration.
B. Assign the new users to the built-in NetworkAdministrator role because it has the permissions that allow telephone configuration.
C. Change the built-in role Patcher role to remove all permissions except those that allow telephone configuration.
D. Add a new TelephonyAdmin role with the specific permissions required to allow telephone configuration.
Answer: D
Question No: 2
Which IP Peer Networking component provides the centralized call routing for Communication Server 1000 systems in an Avaya Aura network solution?
A. Call Manger
B. System manager
C. Session Border Controller
D. Session Manager
Answer: D
Question No: 3
You are configuring a bandwidth management zone on a Communication Server 1000 RIs. 7 x Call Server. The Call Server zones will be used for interface communications between endpoints (IP telephones and gateways).
Which is the preferred bandwidth management strategy, assuming the network has adequate bandwidth?
A. Best Quality (BQ)
B. Best Bandwidth (BB)
C. Allocated Bandwidth (AB)
D. Best Effort (BE)
Answer: A
Question No: 4
Click the Exhibit button.
Given the customeru2021s programmed database shown in the exhibit and AC 1 = 9, over which RLI will a call placed to 9-1-912-534-2222 complete?
A. RLI 9
B. RLI 4
C. RLI 3
D. RLI 2
E. call will not complete as dialed
Answer: B
Question No: 5
Click the Exhibit button.
Consider a companyu2021s dialing plan shown in the exhibit and an example for its requirements:
A station user at the company, with Location Code 221, placed an ESN call, dialing 7-221- 2581. This would be an On-Net call and the NARS programming must remove the LOC code and dial the DN internally.
What programming would remove the location code for a call dialed within the originating Communication Server 1000 to a DN on that same Communication Server 1000?
A. Each site would have its own Location Code programmed as a Home Location Code (HLOC) under Translation Table #1 in their CS 1000.
B. The location codes for each site would be programmed under the LOC programming in Translation Table #2 at all locations.
C. Home NPA Codes (HNPA) for each site would be programmed under Translation Table
#1 at each location in their CS 1000.
D. Each site would have the Location Codes for all sites programmed as Home Location Codes (HLOC) in Translation Table #1 of their CS 1000.
Answer: A
Question No: 6
Which Overlay (LD) is used to find an unused card slot (LUC) for a new Digital Line Card that will support five digital telephones?
A. LD 22
B. LD 20
C. LD 21
D. LD 81
Answer: B
Question No: 7
Click the Exhibit button.
Consider the customeru2021s current programming:
NCOS of 2 = FRL of 2
Class of Service on all sets is CTD
With reference to the exhibit, how would you modify Route List Index 1 to permit all station users with an NCOS of 2 to place 1+912 calls?
A. Change FRL on Route List Index 1 to FRL 1
B. Change FRL on Route List Index 1 to FRL 4
C. Change FLI on NPA entry for 1214 to RLI 2
D. Leave all existing programming as is.
Answer: A
Question No: 8
A customer has deployed a Communication Server 1000 RIs. 7 x system at their site. Their sales department is expanding and you have been asked to add Ave new telephones with the same capabilities as the existing telephones in the department.
Which programming command should you use to complete this task?
A. Move to DN
B. Move from TN
C. Copy from DN
D. Copy from TN
Answer: D
Question No: 9
Click the Exhibit button.
Consider the a customeru2021s dialing plan shown in the exhibit, which detail on-net and off-net dialing requirements:
TIE trunks between Location A and Location B are currently out of service.
TIE trunks between Location B and Location D are currently out of service. All over TIE trunks are fully functional.
Which route will a call to LOC 304-2001 take if it originates from location B?
A. TIE BD to Location D.
B. TIE AB to Location A.
C. TIE BD to Location D, then TIE CD to Location C then TIE AC to Location A
D. The call will not leave the originating PBX
Answer: D
Question No: 10
An existing customer upgraded to Communication Server 1000 RIs 7.5 but plans on staying on an H.323 network environment until their key systems in the network get upgraded to SIP. Their last 7.0 system is just now being put into service and you are configuring the H.323 Gateway Properties using Element Manager.
What is the correct entry for the Primary Gatekeeper IP address?
A. Private domain name field for the Gatekeeper
B. Signaling Server T-LAN IP that runs the Gatekeeper application
C. Signaling Server E-LAN IP that hosts the Primary Re-direct Server
D. Node ID assigned to the site where the Call Server is located
Answer: B
P.S. Easily pass 7004 Exam with Allfreedumps Highest Quality Dumps & pdf vce, Try Free: https://www.allfreedumps.com/7004-dumps.html ( New Questions)