getcertified4sure.com

C2010-825 Exam

IBM C2010-825 Secret 2021




Proper study guides for Down to date IBM IBM Certified Solutions Specialist - Rational Team Concert V6 certified begins with IBM C2010-825 preparation products which designed to deliver the Pinpoint C2010-825 questions by making you pass the C2010-825 test at your first time. Try the free C2010-825 demo right now.

NEW QUESTION 1
A developer working in the RTC Eclipse client has changed several files in the loaded workspace and checked them in. The developer then suspends the changes.
What is the result?

  • A. The change set is discarded and the changes permanently removed.

  • B. The change set is removed from the workspace, but preserved in the repository.

  • C. The change set remains in the Outgoing folder but must be reactivated in order to work with it.

  • D. The change set is marked as complete and then flows to the current flow target of the workspac

Answer: C

NEW QUESTION 2
A manager wants to know how long work items are staying in the In Progress state. Which type of trend report will show this?

  • A. Work Item Aging

  • B. Work Item Closure

  • C. Work Item Creation

  • D. Work Item Turnaround

Answer: A

NEW QUESTION 3
A user needs to import work items into a project area using the RTC Eclipse client. Which file content type can be used?

  • A. XML document

  • B. Rich Text document

  • C. File Interchange format

  • D. Comma Separated Value

Answer: C

NEW QUESTION 4
A developer using the RTC Eclipse client is viewing the history of a component. The developer would like to understand which source files were included in one of the change sets.
How could the developer accomplish this?

  • A. Review the Change Summary for the change set.

  • B. Locate change sets that affected the component.

  • C. View the change set's Open Related work items.

  • D. Export the history with the Include File Details optio

Answer: A

NEW QUESTION 5
A user wants to add widgets from external sources to a RTC Dashboard. Which type can be added?

  • A. Apache Widget

  • B. Open Social Gadget

  • C. Google Open Gadget

  • D. External Content Widget

Answer: A

NEW QUESTION 6
A project manager determines the current iteration is complete and decides that the next iteration should be started. How is this done?

  • A. Set the current iteration's status to complete.

  • B. Set the next iteration as the current iteration.

  • C. Specify that a release is scheduled with the next iteration

  • D. The start and end dates will automatically start the next iteration.

Answer: B

NEW QUESTION 7
A user would like to be kept informed of changes that occur on a particular work item. How can the user accomplish this?

  • A. Subscribe to the work item.

  • B. Use a data warehouse report.

  • C. Review the Open Work Items widget.

  • D. Link the work item to a planning ite

Answer: A

NEW QUESTION 8
What is an advantage of the RTC web client over the RTC Eclipse client when dealing with work items?

  • A. Work items can only be created in the RTC web client.

  • B. The RTC Eclipse client requires an extra license for access.

  • C. Work item approval states can only be set in the RTC web client.

  • D. The RTC web client does not require installing any additional client softwar

Answer: B

NEW QUESTION 9
An RTC administrator has installed JTS and CCM using a departmental server topology and completed the Jazz Team Server and Application Setup process.
How many Public URIs (context root) exist for this topology?

  • A. Zero

  • B. 1 for JTS

  • C. 1 for CCM

  • D. 1 for JTS and 1 for CCM

Answer: C

NEW QUESTION 10
A user notices that work items in the release backlog are initially unordered. What must be done to update the ordering?

  • A. Move each work item to appropriate swimlane.

  • B. Set rank for each work item using drag and drop.

  • C. Set priority for each work item and click Reorder.

  • D. Promote or demote each work item using action men

Answer: C

NEW QUESTION 11
An organization plans to have a large number of project areas. The process engineering team plans to Change roles as well as the associated permissions. The organization does not allow changes to a project area process directly on the production system and needs to minimize the work to deploy a new process to all the project areas.
How can this be accomplished?

  • A. Use Process Sharing.

  • B. Extract the Process Templates.

  • C. Export and import the Process Templates.

  • D. Copy process XML to each production project are

Answer: B

NEW QUESTION 12
Which build artifact allows developers to associate the outcome with a release?

  • A. Build Result

  • B. Build Script

  • C. Build Engine

  • D. Build Definition

Answer: B

NEW QUESTION 13
A scrum master has defined an iteration plan and created several tasks for the plan. The assigned team members are updating the tasks' attributes of Status, Estimate Correction and Time Remaining in the work item editors.
How do these updates affect the plan's Work Breakdown view?

  • A. The progress bars for each team member reflect the changes.

  • B. The view shows work items organized into columns based on status.

  • C. The tasks' ranks are updated automatically to reflect the updated attributes.

  • D. They don't; the tasks must be modified in the plan editor to affect the pla

Answer: A

NEW QUESTION 14
When an RTC user logs onto the JTS Application Administration Web Page to create a new RTC user, the 'Users' menu does not appear.
What is the reason for this?

  • A. The user is not registered as a member of the project area.

  • B. The user does not have JazzAdmins Repository Permission.

  • C. The user does not have the proper RTC Client Access License.

  • D. The user does not have JazzProjectAdmins Repository Permissio

Answer: A

NEW QUESTION 15
A developer has created a repository workspace on the server and wants to be able to access the files locally via installed tools such as editors and compilers.
What action must the developer take to accomplish this?

  • A. Take a baseline of the components.

  • B. Load the contents of the repository workspace.

  • C. Check out the files and save copies to the file system.

  • D. Modify the stream's flow target to match the repository workspac

Answer: A

NEW QUESTION 16
An administrator is evaluating different templates and needs to select one for use on a new project area. Which of the following is the first consideration?

  • A. The team area to release relationship.

  • B. The number of teams in the project area.

  • C. The development process of the software team.

  • D. The geographical distribution of team member

Answer: D

NEW QUESTION 17
What is the source of the data to create metric based reports?

  • A. RTC REST API

  • B. CCM Database

  • C. Data Warehouse

  • D. Data Collection Component Database

Answer: B

NEW QUESTION 18
A scrum master needs to manage work items from multiple project areas and create a cross-project plan with a set of master work items. The scrum master wants to see a roll up of the schedules of work items related to the master work items.
Which work item link type permits this?

  • A. Parent

  • B. Tracks

  • C. Resolves

  • D. Depends On

Answer: D

NEW QUESTION 19
What build related activities can a user accomplish using the RTC web client?

  • A. Define build scripts

  • B. Administer build engines

  • C. Request builds and monitor status

  • D. Create and modify build definitions

Answer: A

NEW QUESTION 20
A user wants to create an enumeration. There is a requirement to allow users with the appropriate permissions to add new literals from the Work Item editor.
Where does the enumeration need to be stored?

  • A. Database

  • B. Process Template

  • C. Repository Workspace

  • D. Process Specification

Answer: A

NEW QUESTION 21
A user needs to export the results from a work item query in the RTC Eclipse client. Which of the below file formats can be used?

  • A. XML file

  • B. PDF document

  • C. Word document

  • D. Spreadsheet format (CSV)

Answer: C

NEW QUESTION 22
A user would like to set up a variable with a value that can be referenced in other fields of the Build Definition editor. What must be added to the build definition?

  • A. Labels

  • B. Variables

  • C. Attributes

  • D. Properties

Answer: A

NEW QUESTION 23
......

Recommend!! Get the Full C2010-825 dumps in VCE and PDF From Dumpscollection, Welcome to Download: https://www.certshared.com/exam/{productsort}/ (New 60 Q&As Version)