we provide Vivid APICS CPIM-BSP free practice test which are the best for clearing CPIM-BSP test, and to get certified by APICS CPIM - Basics of Supply Chain Management. The CPIM-BSP Questions & Answers covers all the knowledge points of the real CPIM-BSP exam. Crack your APICS CPIM-BSP Exam with latest dumps, guaranteed!

Free CPIM-BSP Demo Online For APICS Certifitcation:

NEW QUESTION 1

Which of the following systems typically involves design while manufacturing is occurring?

  • A. Flow
  • B. Intermittent
  • C. Project
  • D. Engineer

Answer: C

NEW QUESTION 2

Companies typically make final purchasing decisions based on which of the following supplier characteristics?

  • A. Reverse logistics
  • B. Personal relationships
  • C. Delivery reliability
  • D. Market share

Answer: C

NEW QUESTION 3

The complete supply chain dedicated to the flow of products for returns, repair and remanufacturing is:

  • A. reverse auction.
  • B. reverse engineering.
  • C. reverse flow scheduling.
  • D. reverse logistics.

Answer: D

NEW QUESTION 4

Which of the following processes is concerned with the transfer or delivery of goods or services?

  • A. Distribution channel
  • B. Supply chain
  • C. Transaction channel
  • D. Value chain

Answer: A

NEW QUESTION 5

Which of the following forecasting techniques eliminates the need to keep months of historical data?

  • A. Exponential smoothing
  • B. Seasonal index
  • C. Delphi
  • D. Trend

Answer: A

NEW QUESTION 6

Which material handling equipment is the most flexible in a distribution center?

  • A. Industrial trucks
  • B. Conveyor
  • C. Crane
  • D. Hoist

Answer: A

NEW QUESTION 7

What is the preferred mode of long-distance transportation for high-value, light-weight cargo?

  • A. Air
  • B. Truck
  • C. Rail
  • D. Ocean

Answer: A

NEW QUESTION 8

To provide the required level of customer service, to minimize the costs of transportation and handling, and to interact with a factory to minimize scheduling problems are all objectives of:

  • A. enterprise resources planning.
  • B. distribution inventory management.
  • C. sales and operations planning.
  • D. customer relations management.

Answer: B

NEW QUESTION 9

Increasing sales through the Internet will result in an increased demand for reverse:

  • A. auctions.
  • B. engineering.
  • C. flow scheduling.
  • D. logistics.

Answer: D

NEW QUESTION 10

The overall objective of an integrated supply chain can best be described as the achievement of:

  • A. decreased lead time.
  • B. increased supplier partnerships.
  • C. an efficient flow of materials and information.
  • D. an efficient flow of production.

Answer: C

NEW QUESTION 11

A distributor provides customer service by improving which of the following market driven factors?

  • A. Availability
  • B. Design
  • C. Shelf life
  • D. Quality

Answer: A

NEW QUESTION 12

In the total cost concept, which of the following logistics costs should be considered when selecting a transportation mode?

  • A. Import duty costs
  • B. Receiving inspection costs
  • C. Inventory purchasing costs
  • D. Inventory carrying costs

Answer: D

NEW QUESTION 13

A product has a forecast of 200 units a month. The actual demand for the past 6 months has been 195, 210, 205, 190, 220, and 225. Which of the following values reflects the mean absolute deviation for this data?

  • A. 7.5
  • B. 12.5
  • C. 45
  • D. 75

Answer: B

NEW QUESTION 14

Which of the following types of manufacturing processes would tend to have the lowest work in process (WIP) inventory?

  • A. Project
  • B. Intermittent
  • C. Batch
  • D. Flow

Answer: D

NEW QUESTION 15

What is the output of sales and operations planning?

  • A. Production plan
  • B. Master production schedule
  • C. Sales plan
  • D. Production order

Answer: A

NEW QUESTION 16

A primary purpose of Quality Function Deployment is to:

  • A. calculate performance limits.
  • B. determine marketing strategies.
  • C. direct product design.
  • D. set pass/fail criteria.

Answer: C

NEW QUESTION 17

Which of the following factors is a primary consideration when contracting with a supplier?

  • A. Inventory levels
  • B. Order cost
  • C. Quantity discounts
  • D. Product quality

Answer: D

NEW QUESTION 18

Which of the following four plant types for the theory of constraints processes one raw material into one final product?

  • A. V-plant
  • B. A-plant
  • C. T-plant
  • D. I-plant

Answer: D

NEW QUESTION 19

Which of the following considerations is an advantage of sourcing from multiple suppliers?

  • A. Competition
  • B. Opportunity for partnering
  • C. Better quality
  • D. Shorter lead times

Answer: A

NEW QUESTION 20

Which plant type describes a product at one stage that can be transformed into several distinct products at the next stage (divergent points)?

  • A. A-Plant
  • B. I-Plant
  • C. T-Plant
  • D. V-Plant

Answer: D

NEW QUESTION 21

Which of the following types of inventory is characterized by item quantity gradually being depleted then replenished?

  • A. Decoupling
  • B. Cycle
  • C. Pipeline
  • D. Anticipation

Answer: B

NEW QUESTION 22

Which of the following circumstances will cause a decrease in a work center's utilization?

  • A. Working overtime
  • B. Working below standard
  • C. Lack of materials
  • D. Rework operations

Answer: C

NEW QUESTION 23

What document or record is used to inform others of the receipt of purchased goods?

  • A. Advance shipping notice
  • B. Invoice
  • C. Receiving report
  • D. Packing slip

Answer: C

NEW QUESTION 24

Which of the following variables best represents a strategic performance measure?

  • A. Revenue growth
  • B. Machine utilization
  • C. Work center capacity
  • D. Cycle time

Answer: A

NEW QUESTION 25

Earliest job due date is an example of:

  • A. dispatching.
  • B. infinite scheduling.
  • C. a chase strategy.
  • D. available-to-promise.

Answer: A

NEW QUESTION 26
......

Recommend!! Get the Full CPIM-BSP dumps in VCE and PDF From Downloadfreepdf.net, Welcome to Download: https://www.downloadfreepdf.net/CPIM-BSP-pdf-download.html (New 155 Q&As Version)