Act now and download your Salesforce Development-Lifecycle-and-Deployment-Designer test today! Do not waste time for the worthless Salesforce Development-Lifecycle-and-Deployment-Designer tutorials. Download Improve Salesforce Salesforce Certified Development Lifecycle and Deployment Designer exam with real questions and answers and begin to learn Salesforce Development-Lifecycle-and-Deployment-Designer with a classic professional.

NEW QUESTION 1
Universal Containers (UC) operates globally from different geographical locations. UC is revisiting their current org strategy. Which three factors should an Architect consider for a single strategy? Choose 3 answers

  • A. Increased ability to collaborate.
  • B. Tailored implementation.
  • C. Centralized data location.
  • D. Consistent processes across the business.
  • E. Fewer inter Dependencies.

Answer: ACD

NEW QUESTION 2
Universal Containers has a large call center that has a limited inventory and must ensure there is product availability before an Opportunity is marked as Closed. Custom Apex has been implemented to check inventory levels before an Opportunity is saved. What should an architect consider before recommending Performance testing?

  • A. Number of unit tests
  • B. Number of Apex Hammer failures
  • C. Number of debug log entries
  • D. Number of concurrent transactions

Answer: D

NEW QUESTION 3
Universal Containers wants to do weekly releases to production. What approach will mitigate the risk of bugs being inadvertently introduced to production?

  • A. User Acceptance Testing
  • B. Use of an Agile Methodology
  • C. Requirements Traceability
  • D. Automated Testing

Answer: D

NEW QUESTION 4
What are three advantages of using a Source Control system alongside a multi -sandbox development strategy? Choose 3 answers

  • A. Perform code reviews before promoting to a pre -production sandbox
  • B. Automatically deploy changes from sandbox to production (Missed)
  • C. Keep a history of changes made by each developer (Missed)
  • D. Create a branching strategy that tracks each feature or change separately (Missed)
  • E. Act as a backup in case of catastrophic data loss

Answer: BCD

NEW QUESTION 5
Universal Containers has recently acquired another business that uses Salesforce extensively. UC wants to merge their Salesforce Orgs to effectively sell and service customer under one business. Traditionally, UC has followed an agile development methodology to deliver Salesforce functionality. With the merging businesses, UC is convinced that adopting a Waterfall development methodology is the best approach. Which are two positive aspects of using a Waterfall development methodology?

  • A. Changes late in the process are expected and can be handled by integrating them into the requirements specs.
  • B. Complex processes that will need to be built are thoroughly understood and documented before coding begins.
  • C. Milestones, timelines and estimates tend to be more accurate and predictable due to the upfront due diligence.
  • D. The costs of starting the project are low since much of the design work is pushed to later stages of the process.

Answer: BC

NEW QUESTION 6
What are two advantages of using an Agile Project Management tool? Choose 2 answers

  • A. Increased visibility into sprint and project status
  • B. Better relationships with business stakeholders
  • C. Consolidate project artifacts to a common repository
  • D. Improve governance with gate steps in development

Answer: AC

NEW QUESTION 7
Universal Containers has written several validation rules and workflow rules for the lead object. Which two test types should an Architect suggest to ensure that a large inbound call center does not experience platform slowdowns under high call volume for the Lead object? Choose 2 answers

  • A. Unit Test
  • B. Stress Test
  • C. Load Test
  • D. Performance Test

Answer: CD

NEW QUESTION 8
Universal Containers is looking to construct a continuous integration process to help manage code quality. Which three tools should be used to enable this? Choose 3 answers

  • A. Force.com Migration Tool
  • B. Full Sandbox Environment
  • C. Source Control Tool
  • D. Project Management Tool
  • E. Continuous Integration Build Tool

Answer: ACE

NEW QUESTION 9
Universal Containers wants to implement a release strategy with major releases every four weeks and minor releases every week. Major releases follow Development, System Testing (SIT), User Acceptance Testing (UAT) and Training Minor releases follow Development and User Acceptance Testing (UAT) stages. What represents a valid environment strategy consideration for UAT?

  • A. Minor releases use Partial copy and Major releases use Full copy
  • B. Minor and Major releases use separate Developer pro
  • C. Minor releases use Developer and Major releases Full copy
  • D. Minor and Major releases use same Full copy.

Answer: A

NEW QUESTION 10
Universal Containers (UC) is using Salesforce for their sales organization. The sales users have created several dashboards using multiple running users. The admins have also added a few workflow rues that send email notifications to some sales users. What should an Architect consider while planning the deployment of such components? Choose 2 answers

  • A. If the username in the source org doesn't exist in the target org, the deployment will continue and Salesforce will automatically create the username in the target org.
  • B. User fields are ignored during metadata deployments and all such users need to be manually created in the target org before starting the deployment.
  • C. If the username in the source org doesn't exist in the target org, the deployment will stop until the usernames are resolved or removed.
  • D. User Fields are preserved during metadata deployments and Salesforce attempts to locate a matching user in the target org during deployment.

Answer: CD

NEW QUESTION 11
When replacing an old legacy system with Salesforce, which two strategies should the plan consider to mitigate the risks associated with migrating data from the legacy system to Salesforec? Choose 2 answers?

  • A. Identify the data relevant to the new system, including dependencies, and develop a plan/scripts for verification of data integrity.
  • B. Migrate users in phases based on their functions, requiring parallel use of legacy system and Salesforce for certain period of time.
  • C. Use a full sandbox environment for all the systems involved, a full deployment plan with test data generation scripts, and full testing including integrations.
  • D. Use a full sandbox environment and perform test runs of data migration scripts/processes with real data from the legacy system.

Answer: BD

NEW QUESTION 12
What sandbox type would be appropriate for diagnosing reports of poor performance when accessing certain Visualforce pages?

  • A. Partial copy Sandbox.
  • B. Developer Sandbox.
  • C. Full Sandbox
  • D. Developer Pro Sandbox.

Answer: C

NEW QUESTION 13
Universal Containers has just initiated a project to implement partner community. The application will be deployed into a production environment currently in use by a large Salesforce user base. The project manager has insisted that the development and testing team use a single developer sandbox. What is the risk with this approach?

  • A. Tester will encounter platform limits due to developer sandbox capacity limits.
  • B. Testers will experience functional changes throughput testing due to not having isolation form development.
  • C. Testers will hit governor limits due to large volume of users in the developer sandbox.
  • D. Refreshing the developer sandbox will take significant time.

Answer: B

NEW QUESTION 14
Universal Containers is a global organization that maintains regional production instances of Salesforce. One region has created a new custom object to track Shipping Containers. The CIO has requested that this new object be used globally by all Salesforce instances and further maintained and modified regionally by local administrators. Which two deployment tools will support this request? Choose 2 answers

  • A. Tooling API
  • B. Force.com IDE
  • C. Change sets
  • D. Force.com Migration Tool

Answer: BD

NEW QUESTION 15
What is the responsibility of the Technical Architect within a Change Control Board meeting?

  • A. Prioritize the Salesforce product roadmap with business stakeholders
  • B. Conduct code reviews for projects in the development phase
  • C. Troubleshoot deployment errors that occurred during the last release
  • D. Approve the upcoming release for deployment into production

Answer: D

NEW QUESTION 16
Universal Containers is starting a Center of Excellence (COE). Which two user groups should an Architect recommend to join the COE?

  • A. Call Center Agents
  • B. Program Team
  • C. Executive Sponsors.
  • D. Inside Sales Users.

Answer: BC

NEW QUESTION 17
Universal Containers (UC) wants to shorten their deployment time to production by controlling which tests to run in production .UC's Architect has suggested that they run only subsets of tests. Which two statements are true regarding running specific tests during deployments? Choose 2 answers

  • A. To run a subset of tests, set the Run Specified Tests test level on the DeployOptions objects and pass it as an argument to deploy() call.
  • B. run a subset of tests ,set the RunLocalTests test level on the DeployOptions object and pass it as anargument to deploy() call.
  • C. Specify both test classes and individual test methods that are required to be executed as both are supported in DeployOptions.
  • D. Specifying the test method is supported in DeployOptions, therefore specify only the test classes that are required to be executed.

Answer: AD

NEW QUESTION 18
Universal Containers (UC) is considering updating their Salesforce Release Management process. Which three best practices should UC consider for Release Management? Choose 3 answers

  • A. Design the right sandbox strategy for the release.
  • B. Release sign-off is only required for Production.
  • C. Regression testing is mandatory for each release.
  • D. Maintain a pre/post deployment checklist for each release.
  • E. Publish a release calendar for each phase of the release.

Answer: ADE

NEW QUESTION 19
Universal Containers (UC) is working on a project to support environmental cleanup projects with specially designed containers. To support this project, UC is developing a portal for regulatory agencies to use for tracking and reporting of the containers, and these regulatory requirements are well-defined. Many non -regulatory requirements have not been defined yet. The project is on a strict budget and timeline. Which two approaches should UC consider to meet regulatory requirements and to satisfy the needs of end users? Choose 2 answers

  • A. Initiate a waterfall project and start building the features of the solution based on regulatory requirement
  • B. In parallel, gather the remaining non -regulatory requirements for the solution, then go back and reconcile the two sets of requirements and re -work the solution as necessary
  • C. Initiate an Agile project, beginning with a "sprint 0" to scope and estimate the project and to build the product backlo
  • D. Identify the minimum viable produc
  • E. Initiate building the solution based on the backlog, and co -create the design with the project stakeholders
  • F. Initiate a waterfall project by gathering the remaining requirements and completing the architecture and desig
  • G. Initiate the build/test processes with frequent reviews by the stakeholder
  • H. On build completion, perform acceptance testing and validate compliance with regulatory requirements
  • I. Initiate an Agile project based on the known requirements, begin building immediately, and work through remaining requirements as they come u
  • J. Budget and timeline will not be a factor with an Agile methodology

Answer: AC

NEW QUESTION 20
Universal Containers is building a custom application on the Force.com platform. There is a budget and release date that has been set by the board of directors, but the application must meet the requirements that will be submitted and voted on by a public user community. What is the risk associated with the scenario?

  • A. The requirements should not be solicited by an external community
  • B. The project is not using the Waterfall methodology
  • C. The project is not using an Agile methodology
  • D. The requirements are unknown and the release date has been set.

Answer: D

NEW QUESTION 21
A Salesforce Administrator has initiated a deployment using a change set. the deployment has taken more time than usual. What is the potential reason for this?

  • A. The change set includes changes to permission sets and profiles.
  • B. The change set includes Field type changes for some objects.
  • C. The change set includes new custom objects and custom fields.
  • D. The change set performance is independent of included components.

Answer: A

NEW QUESTION 22
Universal Containers business users often observe that newly released features are resulting in other previously existing and stable functionality being broken. Which approach should an Architect recommend to prevent regression?

  • A. Utilize the developer console to run test suites for the affected functionality
  • B. Utilize unit and functional test automation as part of a continuous integration strategy
  • C. Utilize Salesforce Apex Hammer to automatically test all functionality
  • D. Freeze development of new features and re -architect the system to remove the bugs

Answer: B

NEW QUESTION 23
Universal Containers (UC) is developing a custom Force.com application. The following tools are used for development, the Force.com IDE for developing apps. Git as a source control system and a Git repository, and the Force.com Migration Tool for updating sandboxes from source control. UC's current branching strategy calls for two main branches: 1) Master 2) Develop Three supporting branches: 1) Feature 2) Release 3) Hotflix Consider that the branching strategy is in parallel as follows Feature |Develop |Release |Hotfix |Master What is the recommended practice strategy that Developers should adopt for Development?

  • A. Developers work off of the Feature branch, which is pulled from the Master branch and the Feature branch is then merged with the Develop branch.
  • B. Developers work off of the Feature branch, which is pulled from the Develop branch, and the Feature branch is then merged with the Develop branch.
  • C. Developers work off of the Feature branch, which is pulled from the Release branch, and the Feature branch is then merged with the Develop branch.
  • D. Developers work off of the Feature branch, which is pulled from the Develop branch, and the Feature branch is then merged with the Hotfix branch.

Answer: B

NEW QUESTION 24
......