Exam Code: 70-695 (Practice Exam Latest Test Questions VCE PDF)
Exam Name: Deploying Windows Devices and Enterprise Apps
Certification Provider: Microsoft
Free Today! Guaranteed Training- Pass 70-695 Exam.
Q31. DRAG DROP - (Topic 3)
You need to prepare Server1 and Server101 for an operating system deployment.
What should you configure on each server? To answer, drag the appropriate actions to the correct servers. Each action may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
Answer:
Topic 4, Proseware Inc.
Case Study Overview
General Overview
Proseware Inc., is a manufacturing company that has 3,000 employees. The company has a sales department a marketing department, a research department, a customer service department, and a human resources department.
Physical Locations
Proseware has two main offices and five branch offices. The main offices are located in New York City and Paris. The branch offices are located throughout North America.
All offices have a high-speed connection to the Internet. The offices connect to each other through the Internet by using VPN appliances.
Existing Environment Active Directory
The network contains two Active Directory forests named na.proseware.com and fr.proseware.com. Each forest contains a single domain. All domain controllers run Windows Server 2012 R2.
The main office in New York City and all the branch offices each contain a domain controller for the na.proseware.com forest. The main office in Paris contains domain controllers for the fr.proseware.com forest only.
Due to legal requirements, the na.proseware.com and fr.proseware.com forests must remain separate. Administrators from each forest are allowed to manage the resources in their respective forest only.
Users from all of the departments are located in each office. Users in the research department store their research data in local folders on their computer. The data can be up to 100 GB on each computer.
Each office is configured as an Active Directory site. All of the domain controllers are configured as DNS servers. All of the client computers are configured to connect to the DNS servers in their respective office only. All of the domain controllers are configured as DHCP servers.
New York Office
The computers in the New York City office are managed by using Microsoft System Center 2012 R2 Configuration Manager. The New York City office has the following servers and client computers:
• A Key Management Service (KMS) server host
• Client computers that run Windows 7 and Microsoft Office 2010
• • Five file servers that host multiple shared folders and run Windows Server 2012 R2
• A server that runs Windows Server 2012 R2 and is configured as a Configuration Manager site server
Branch Offices
Each branch office has the following servers and client computers:
• Client computers that run Windows 7 and Office 2010
• A file server that hosts multiple shared folders and runs Windows Server 2012 R2
Currently, the branch offices are not managed by using the Configuration Manager deployment in the New York City office.
Paris Offices
The Pans office has the following servers and client computers:
• Client computers that run Windows 7 and Office 2010
• Five file servers that host multiple shared folders and run Windows Server 2012 R2 Currently, the activation of the client computers in the Pans office is performed manually. Deployments
Currently, all new client computers are shipped initially to and imaged in the New York City office, and then shipped to the other offices. There are multiple images for both 32-bit and 64-bitcomputers. The images contain specific drivers for each type of computer. All of the computers are PXE-compatible.
If a client computer must be reimaged, the reimaging is performed locally at each office by using a boot disk and a USB hard drive that contains multiple images. USB hard drives storing updated images are sent to each office every six months.
Applications
A third-party desktop application named App1 is used by the sales department.
All of the users in the human resources department use an application named HR1. HR1 is installed by using a Windows Installer (MSI) package. HR1 is compatible with Windows 7 only.
Problem Statements
Proseware identifies the following issues:
• Users in the branch offices report that it can take up to four weeks to receive a requested new client computer, which is too long.
• If a client computer must be reimaged, it can take several hours before the computer is ready for use again due to the updates that must be applied.
• Currently, the hardware used for the client computers in the Paris office is undocumented. All of the computers in the customer service department and the research department were replaced during the past year.
Requirements Business Goals
As much as possible, Proseware plans to minimize the costs associated with purchasing hardware and software.
Planned Changes
Proseware plans to deploy a new version of its standard operating environment (SOE). The new SOE will contain the following:
• A volume license edition of Windows 8.1 Enterprise (64-bit)
• A volume license edition of Office 2013 (32-bit)
A new line-of-business Windows Store app named App2 will be deployed. App2 will be used by all users.
New client computers will be delivered directly from the hardware vendor to each office. As a result, Proseware plans to change the imaging process.
Technical Requirements
Proseware identifies the following technical requirements:
• Minimize the size of desktop images.
• Centralize the activation of all the client computers.
• Minimize the amount of network traffic over the VPN.
• Minimize the number of desktop images that must be maintained.
• Ensure that only the users in the human resources department can access HR1.
• Ensure that the data of the research department users is retained while deploying the new image.
• Minimize the amount of time it takes to upgrade the research department computers in the Paris office.
• Ensure that a branch office administrator can deploy a new image to new client computers with minimal delay.
• Ensure that the French language is configured as the default language for the client computers in the Paris office.
• • A network technician will visit each client computer in the Paris office to start the operating system deployments.
• Gather a detailed hardware inventory of all the client computers in the Paris office without installing any additional software on the computers.
• Users in the research and customer service departments in the Paris office will have the new image deployed to their current computer. The current Windows installation will not be preserved during the upgrade.
• All of the other client computers in the Paris office will be replaced with new computers during the next two years. During this time, some computers may need to be reimaged by using the current Windows image.
Q32. HOTSPOT - (Topic 5)
You manage a deployment of Microsoft System Center 2012 R2 Configuration Manager. Configuration Manager is integrated with the Microsoft Deployment Toolkit (MDT) 2013.
You create an MDT Zero Touch Installation (ZTI) client task sequence named TS1 and deploy TS1 to a test computer named Client1. TS1 continually fails on Client1.
You need to add a task to TS1 to allow you to troubleshoot TS1 from Client1 interactively. Which type of task should you add to TS1 and which ZTI component should the task
reference? To answer, select the appropriate task type and ZTI component in the answer
area.
Answer:
Q33. DRAG DROP - (Topic 3)
You need to recommend a procedure for configuring the deployment of Office 2013 on the production network.
Which four actions should you recommend be performed in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Q34. - (Topic 3)
You need to use Configuration Manager to deploy operating systems to the production network. The solution must meet the technical requirements.
Which two actions should you perform? Each correct answer presents part of the solution.
A. Add an operating system image.
B. Run the Create Automatic Deployment Rule Wizard.
C. Add an operating system installer.
D. Run the Create Task Sequence Wizard.
E. Run the Schedule Updates Wizard.
Answer: A,D
Q35. - (Topic 5)
Your network contains one Active Directory domain named contoso.com. The domain contains a server named Server1 that runs Windows Server 2012 R2. Server1 is a Windows Deployment Services (WDS) server.
Computer technicians are allowed to configure disk partitions manually and to choose any operating system image when deploying an operating system by using WDS. All of the operating system images are in the same image group.
You purchase 10 new client computers.
You plan to deploy the same image of Windows 8.1 Enterprise to all of the computers. You need to ensure that disk configuration and image selection for all of the computers is
fully automated.
What is the best action to perform from Server1? More than one answer choice may achieve the goal. Select the BEST answer.
A. Run wdsutil end specify the /Add-Device switch for each client computer.
B. Run wdsutil and specify the /Set-Server switch.
C. Run wdsutil and specify the /Add-ImageGroup switch.
D. Create computer objects in Active Directory for each new client computer.
Answer: A
Explanation: References:
https://technet.microsoft.com/en-us/library/cc754289(v=ws.10).aspx
Q36. - (Topic 5)
You have a deployment of Microsoft System Center 2012 R2 Configuration Manager. You plan to deploy a Click-to-Run installation of Microsoft Office 365 ProPlus.
On a client computer named Computer1, you download the installation files by using the Office Deployment Tool for Click-to-Run.
You need to deploy Office 365 ProPlus to all of the client computers as a Microsoft Application Visualization (App-V) package by using Configuration Manager.
What is the best action to perform first? More than one answer choice may achieve the goal. Select the BEST answer.
A. From Configuration Manager, import a package.
B. Run appv_sequencer_setup.exe.
C. Run setup.exe.
D. From Configuration Manager, import an application.
Answer: A
Explanation: References: http://blogs.technet.com/b/pauljones/archive/2013/08/28/office-2013-click-to-run-with-configuration-manager-2012.aspx
Q37. - (Topic 4)
You need to recommend a solution for the research department computers in the Paris office.
Which action should you include in the recommendation?
A. a User State Migration Tool (USMT) script that uses a remote migration store
B. a User State Migration Tool (USMT) script that performs a hard-link migration
C. a Configuration Manager package that performs a hard link migration
D. a Configuration Manager package that uses remote configuration storage
Answer: B
Topic 5, Mix Questions
42. - (Topic 5)
You use the Key Management Service (KMS) to activate Microsoft Office 2013.
You need to trigger the activation of Office 2013 on a client computer. Which tool should you use?
A. Ospp.vbs
B. Onlinesetup.cmd
C. Slui.exe
D. Wuauclt.exe
Answer: A
Explanation: References:
https://technet.microsoft.com/en-gb/library/ee624350.aspx#section1
Q38. - (Topic 5)
Your company uses the computer builds shown in the following table.
You plan to deploy Windows 8.1 Enterprise to the different computer builds by using Windows Deployment Services (WDS).
You need to recommend how many images must be created.
How many images is the best recommendation? More than one answer choice may achieve the goal. Select the BEST answer.
A. 1
B. 2
C. 3
D. 4
Answer: D
Q39. - (Topic 5)
You have a server named Server1 that runs Windows Server 2012 R2 and a 64-bit UEFI- based computer named Computer1 that runs Windows 8.1 Enterprise.
Server1 is a Windows Deployment Services (WDS) server.
From the installation media of the 32-bit version of Windows 8.1, you add a boot image named Image1 to WDS.
You need to use WDS to capture an image of Computer1. What should you do first on Server1?
A. Add an install image from the Windows 8.1 installation media.
B. Run wdsutil.exe and specify the New-CaptureImage and the Architecture:x64 parameters.
C. Add a boot image from the Windows Server 2012 R2 installation media.
D. Run wdsutil.exe and specify the New-CaptureImage and the Architecture:x86 parameters.
Answer: C
Explanation: References:
https://technet.microsoft.com/en-us/library/hh290675(v=ws.10).aspx
Q40. - (Topic 5)
You have a client computer named Computer1 that runs Windows 8.1 Enterprise.
You install the Windows Assessment and Deployment Kit (Windows ADK) on Computer1.
You sign in to Computer1 as a local user named User1. You insert the Windows 8.1 installation media into the DVD drive on Computer1.
You need to use Windows ADK to create an answer file for the deployment of Windows 8.1 Enterprise.
What should you do first?
A. From Windows PowerShell, run Copy-Item
B. From Windows System Image Manager, click Import Package(s).
C. From Windows System Image Manager, click Create Configuration Set...
D. From Deployment and Imaging Tools Environment run dism.exe and specify the Mount- Wim parameter.
Answer: A
Explanation:
You need to copy the Windows base-image file from the DVD to the local hard disk.
References: https://technet.microsoft.com/en-GB/library/dn621904.aspx